San Ramon Valley Unified School District Solor (PH 1-3B)

Location: San Ramon, Danville, Alamo
Contract Amount: $3,500,000.00
General Contractor: SunPower Corporation

Project Description: Installation of over 3.4 Mega Watts of elevated tracker PV solar panels on carport structures during the summer break at five school sites. This contract included installation of the PV panels, switchgear and wiring back to the utility point of connection.

Projected Completed: March 2017