ABSMC Dietary Department and MRI

Location: Oakland
Contract Amount: $2,855,058.00
General Contractor: Herrero Builders

Description: This 26,000 square foot HCAI hospital project involved the complete demolition and renovation of the central dietary and food prep for the hospital complex, as well as full build out of a new MRI department and doctors lounge area. Del Monte Electric provided the complete electrical installation, including extensive electrical distribution, MRI suite aluminum conduit installation, food service connections to over 100 pieces of equipment, and tie-ins to the various hospital systems.  This project was completed in extremely tight existing conditions, as the project was constructed above the central utility plant and sterile processing and below the existing imaging department.  Extensive use of laser scanning and BIM modeling provided the team with a coordinated model and constructible set of drawings.  Del Monte Electric was a risk/reward team member on this Integrated Lean Project Delivery project. 

Project Completed: March 2020