Our prefabrication shop builds coordinated assemblies off-site to improve quality, reduce labor costs, and support faster, more efficient installations.

Del Monte Electric’s fully equipped prefabrication facility allows our team to build repetitive electrical assemblies in a controlled environment before they are delivered to the jobsite.
This approach supports safer working conditions, consistent quality, reduced material waste, and more efficient use of field labor. It also allows assemblies to be delivered when they are needed, helping maintain workflow and support the project schedule.

Prefabrication begins with early review of the contract documents and close coordination between our BIM team, project management team, and field leadership. Working together, these teams identify potential conflicts, confirm installation requirements, and develop practical solutions before work begins in the field.
The coordinated model provides the detailed layouts and accurate information needed to develop assemblies for fabrication. This connection between BIM and prefabrication helps reduce rework, improve installation speed, and produce consistent assemblies that arrive on site ready to install.
By moving appropriate work into a controlled environment, we help improve safety, quality, predictability, and overall project performance.
Trusted by clients for decades, we combine deep industry knowledge with meticulous execution.