ABSMC Dietary Department and MRI

Location: OaklandContract Amount: $2,855,058.00 General Contractor: Herrero Builders Description: This project involved relocating the dietary and food prep for the entire hospital to a new location within the exiting building. It also included the installation of a new MRI suite and a doctor’s lounge.

George Mark Children’s Home

George Mark Children’s Home was a sixteen thousand square foot new building on the Fairmont Hospital Campus for severely ill children and their families. The project was built to replicate a large custom house to help the children and families feel at home. Del Monte Electric was honored to be part of this special project. Read More

Kaiser Hospital Operating Room Upgrade

Location: Richmond Contract Amount: $3,100,000.00General Contractor: Dome Construction Description: A 39,000 sq. ft. expansion of an existing hospital, including emergency power, lighting, lighting controls, fire alarm, operating rooms and headwall units. Required connection to existing emergency, critical, life safety and normal power in an operating central plant.

Kaiser New Hospital Building

Location: Richmond Contract Amount: $7,100,000.00General Contractor: Morrison-Knudsen Description: Construction of a new hospital including lighting, lighting controls, normal and emergency power distribution, fire alarm, nurse call, paging, and data systems.

Sutter Health 2500 Milvia Medical Office Building

Location: BerkeleyContract Amount: $1,332,234.00 General Contractor: Herrero Builders Project Description: Design and build renovation of an existing 28,000 medical office building that was stripped down to the exterior walls and re-designed to meet current health care demands. Numerous exam rooms, office spaces, and conference spaces were designed and built with the latest technologies to meet… Read More